http://bhelviz.co.in/Pages/images/epc.gif

Engineering

  • Manned  by  110  qualified  engineers

Discipline  

Process 
Mechanical 
Piping 
Rotating  equipment 
Civil & Structural 
Instrumentation 
Electrical 

           Excellent  CAD  facilities  for  undertaking  design  and drafting,  using  latest  third  party  software  packages  in  house  developed  packages  like:

  • AutoCAD  
  • Caesar - for  flexibility  analysis of  piping
  • STAAD - PRO for structural  analysis
  • ANYSIS - For FEM Analysis
  • PDS - Plant Design
  • PV ELITE- for pressure vessels / Columns design
  • Process  calculations software- for  Cryogenics/Oil & Gas  systems.

Procurement

BHEL HPVP  has  a  strong  qualified  procurement  group  of  40 persons :

  • Adoption  of  modern  methods  of  procurement / e-procurement / display of Tenders in Website
  • Establishing  back to  back  arrangement at  the  bidding  stage  itself.  Extensive  computer  facilities  and  communication  network. 
  • Systematic  and  continuous  development of vendors to meet the  demands  of  turnkey  projects  
  • Procurement with objective of ordering and receipt of materials with shortest possible cycle time to meet the Project schedules.

Construction

Facilities  available  include :  

  • Heavy  Cranes  
  • Testing Equipment & Facilities 
  • Roller  positioners  
  • Welding  equipments  
  • NDT  facilities  at  sites  
  • Material  handling  equipment

 

Project   Management   

Each  project  is  headed  by  a  Project  Manager  handling  the  following  activities : 

Ensuring  that  all  information  received / developed during  the  basic  engineering  stage  is  finalized. 

Developing  the  task  force  team  identifying  the  key  personnel  of  the  project.  

Developing  the  project  scope  and  procedure  

Issuing  job  instructions  

Issuing  the  project  schedule  

Giving  the  quantum  of  work  to  be completed  for the  various  activities  of  the  project.  

Issuing  the  monthly  schedules  to  each  section   and reviewing  the progress  every  week.  

Holding the review meetings internally as well as with customers  and  sub-vendors.  

Monthly  progress  reports  and  exceptional  reports.  

Monitoring  the  progress  by  periodical  visits  to  the  job  sites.  

Coordinating  with  commissioning  group. 

Experience  :

           BHEL HPVP   engineered  more  than  275  Turnkey  Plants  of   different  types  in  varied  fields  of  Cryogenics,   Energy  Systems  and  Hydrocarbon.

Cryogenics    

24 nos. Tonnage  Air  Separation  plants  

41 nos.  High  Purity  Nitrogen  plants  

2 nos.  Nitrogen  Wash  Units  

6 nos.  Purge  Gas  Recovery  Units

 

Energy  Systems    

27 nos.  Industrial  boilers  

63 nos.  Fired  heaters  

  5 nos.  Reformers  

Hydrocarbons

Major  Turnkey  Packages  executed :
 

LPG   import  terminal  for   IOCL - Kandla, with  tankage   of  capacity  2,600 m3 and  pipe line  of  7 kms.  and  civil  works

Crude  Stabilization  Unit  to ONGC, Gandhar  

Desalter  Plant  for  ONGC,   Navagam  

GSU/LPG  Recovery Unit  for  MRL,  Nagapattinam

Sulphur  Recovery  Unit  for  IOCL,   Panipat.

Sulphur  Recovery  Unit  for  IOCL, Barauni

Sulphur  Recovery  Unit  for  IOCL, Digboi

 

Heaviest Vacuum Column for IOCL - HALDIA

iocl2.gif (78231 bytes)

BHEL HPVP  has  made  yet  another   break  through  in  the  manufacturing  and  supply   of  critical  process  equipment  for  Petroleum   Refineries  by  supplying  a  huge  monolith  " Vacuum  Column "  9 . 6  Mtr  Diameter ,  61 . 1  Mtr .   Long  and  Weighing  560  MT  in  single  piece.

BHEL HPVP  designed  and  fabricated   the  special  lifting  trunnions,  tailing  lugs  etc .  which  need  to  take  on  heavy  loads  during   erection.   The  Vacuum  Column  is  fabricated   in  a  Record  time  of  15  Months.

This  big  piece  of   equipment  was  transported  on  Barge  by  sea   from  Visakhapatnam Port  to  Haldia   Port  in   single  piece  and  by  Road  by  Haldia  Port   to  IOCL  Refinery.   Erection  was  carried   out  by  Hydraulic  Jack  Method  using  Triangular   Tower  Derricks.